Paris node LMP, Zone 2 MCP, POI-constrained solar priority, DA/RT co-optimization, degradation, and benchmarks.
Regulation is mutually exclusive with Spin/STR; Spin + STR are stackable. Solar gets first priority behind the 250 MW POI limit.
Audits expected Regulation movement, charge-efficiency loss, projected SOC drift, replacement energy, recovery charge, and degradation.
Charge bids clear when actual 5-minute RT LMP is less than or equal to the leg price. Support-DA hours use the support sensitivity; all other forecasted charge hours use the opportunistic sensitivity.
Offer-Time Realistic mode stores submitted RT charge/discharge/ASM offer curves before clearing. Actual RT prices then only determine whether those already-submitted offers clear.
Stepped mode clears the highest MW block whose price is at or below MCP. Sloped mode interpolates between MW/price pairs.
Collapsed by default. Expand to review the latest backtest/co-optimization summary.
Click any chart point to update this panel.
Read-only forecast workspace for DA/RT price, ASM, load, wind generation, Paris Solar P90, and native Amperon Solar data.
otszksmy_temac_v2.vaisala_paris_power_p90.Native Amperon solar forecast data used by the Forward Schedule Advisor solar-source selector.
Day-Ahead Offer Strategy Recommendation built from the selected forecast vintage at the 09:00 Central workflow pass. Uses forecasted DA/RT LMP plus forecasted DA Regulation, Spin, and Supplemental MCP. STR is held out until an STR forecast is available.
Takes replayed DA awards, preserve/unwind settings, retained charge hedge, Target SOC policy, and RT forecasts, then solves a post-award preserve / unwind / recharge plan. This is the FSA-158/FSA-159 workflow shell.
What it uses: replayed/pasted DA awards, the preserved/unwound MW decisions, retained charge hedge settings, forecast RT LMPs, Target SOC policy, and current projected SOC.
What it decides: how much cleared DA energy to physically preserve, how much to buy back/unwind, how much RT charge to keep, and how the SOC path should roll forward.
What it does not do yet: it does not query MISO for official awards, and it does not settle actual RT outcomes. Those will come from the future DA/RT ingestors and settlement hooks.
Workflow: run the DA Offer Strategy Recommendation, apply pasted DA results, then run Post-Award Rebalance to create the post-award preserve/unwind plan.
Prepopulate with forecasted DA LMP/MCP values, adjust as needed, then apply. Also accepts a single DA LMP column, HE + DA LMP, or HE + DA LMP + DA Reg/Spin/Supp MCP columns from Excel, Numbers, or Pages.